D

EP-014 · Pillar: AI builds

I Replaced My Marketing Team With 5 AI Agents (Full Build)

Production 3/7 clips delivered Target 12:00 Publish target Jul 24 DPA
  1. Idea
  2. Research
  3. Brief
  4. Script
  5. Direction
  6. Gate passed Script & direction · approved by Deven · Jul 9
  7. Production Current · 3/7 clips
  8. Assembly
  9. Gate Final-cut approval
  10. Package
  11. Published

Locked brief

Angle

Not another ‘AI will replace you’ take — a real build: five agents doing research, content, ads and reporting; what worked, what broke, what it costs.

Audience promise

By the end you can assemble the same 5-agent stack — with the exact prompts and costs shown on screen.

Production — clip tasks

Segments grouped into 7 tasks · from locked script v4
S1–S3 Avatar (HeyGen) Cold open + framing PPriya Delivered v2
S4 Motion graphic The 5-agent org chart AArjun Delivered v1
S5–S7 Screen recording Building Agent 1 — research (GoUltra) AArjun In progress
S9–S11 Screen recording Agents 2+3: content + ads run AArjun Needs changes
Recording caught the wrong workspace — re-take with the demo brand. — Deven
S12 Avatar (HeyGen) Costs + what broke PPriya Delivered v1
S13 Motion graphic Cost breakdown animation Unassigned Queued

Activity

  • Priya uploaded avatar-open-v2.mp4 → Clip 1 2h ago
  • Deven requested changes on Clip 5 5h ago
  • Arjun started Clip 3 yesterday
  • Gate passed: Script & direction approved by Deven Jul 9
  • AI proposed the segment breakdown (13 segments) Jul 8
Next gate

Final-cut approval

Assembly can start when all 7 clips are delivered. Package unlocks only after Deven approves a cut.

No cut uploaded yet

Team

  • D Deven
    Director
  • P Priya
    Producer
    3 tasks
  • A Arjun
    Producer
    3 tasks
  • 1 task unassigned