Style direction A

Family

Showrunner reads as a native member of the GoUltra product family.

Display & UI — Plus Jakarta Sans Body — DM Sans
Type specimen
Showrunner.
Production is a pipeline, not a pile of files.

Every episode moves left to right through the same stages, from idea to published. Producers always see what to make next, and the Director always sees what to approve.

Plus Jakarta Sans · display & UI DM Sans · body
Palette
Background
#F8FAFC
Surface
#FFFFFF
Ink
#0F172A
Muted text
#64748B
Accent
#E37400
Accent light
#F5A623
Success
#0D9488
Danger
#D93025
CTA gradient
#F77062 → #BC4CF4
Buttons
Status chips
Delivered In progress Needs changes Queued Gate
Input
Card
EP-014 · Pillar: AI builds
I Replaced My Marketing Team With 5 AI Agents (Full Build)
Production 3/7 clips delivered
D

EP-014 · Pillar: AI builds

I Replaced My Marketing Team With 5 AI Agents (Full Build)

Production 3/7 clips delivered Target 12:00 Publish target Jul 24 DPA
  1. Idea
  2. Research
  3. Brief
  4. Script
  5. Direction
  6. Gate passed Script & direction · approved by Deven · Jul 9
  7. Production Current · 3/7 clips
  8. Assembly
  9. Gate Final-cut approval
  10. Package
  11. Published

Locked brief

Angle

Not another ‘AI will replace you’ take — a real build: five agents doing research, content, ads and reporting; what worked, what broke, what it costs.

Audience promise

By the end you can assemble the same 5-agent stack — with the exact prompts and costs shown on screen.

Production — clip tasks

Segments grouped into 7 tasks · from locked script v4
S1–S3 Avatar (HeyGen) Cold open + framing PPriya Delivered v2
S4 Motion graphic The 5-agent org chart AArjun Delivered v1
S5–S7 Screen recording Building Agent 1 — research (GoUltra) AArjun In progress
S8 AI clip ‘Agents at work’ abstract sequence — Seedance package ready PPriya In progress
S9–S11 Screen recording Agents 2+3: content + ads run AArjun Needs changes
Recording caught the wrong workspace — re-take with the demo brand. — Deven
S12 Avatar (HeyGen) Costs + what broke PPriya Delivered v1
S13 Motion graphic Cost breakdown animation Unassigned Queued

Activity

  • Priya uploaded avatar-open-v2.mp4 → Clip 1 2h ago
  • Deven requested changes on Clip 5 5h ago
  • Arjun claimed Clip 3 yesterday
  • Gate passed: Script & direction approved by Deven Jul 9
  • AI proposed the segment breakdown (13 segments) Jul 8
Next gate

Final-cut approval

Assembly can start when all 7 clips are delivered. Package unlocks only after Deven approves a cut.

No cut uploaded yet

Team

  • D Deven
    Director
  • P Priya
    Producer
    3 tasks
  • A Arjun
    Producer
    3 tasks
  • 1 task unassigned